The less-simplified Punnett square Now that I have learned that genes for eye color happen on multiple chromosomes and have been identified on chromosomes 15 and 19, I can create a Punnett square that more accurately reflects my potential offspring. It also reflects why the simpler form is normally used. Parent 1: brown eyes Genotype: bey2: brown-blue, gey: green-blue Parent 2: blue eyes Genotype: bey2: blue-blue gey: blueblue bey2: gey: Brown blue Brown Green blue Green blue blue blue blue Brown-blue blue-blue Brown-blue blue-blue Green-blue Green-blue blue-blue blue-blue blue blue Brown-blue blue-blue Brown-blue blue-blue Green-blue Green-blue blue-blue blue-blue blue blue Brown-blue blue-blue Brown-blue blue-blue Green-blue Green-blue blue-blue blue-blue blue blue Brown-blue blue-blue Brown-blue blue-blue Green-blue Green-blue blue-blue blue-blue
View full slide show




Citation Networks • Butterfly Browser • Mackinlay,… (PARC) Butterfly: Left = refs Right = citers Yellow = #citers Blue = visited 3d plot: date, Name, # citers
View full slide show




Total Order Plans: Partial Order Plans: Start Left Sock Right Sock Left Sock on Right Sock on Left Shoe Right Shoe Left Shoe on Start Start Start Start Start Start Right Sock Right Sock Left Sock Left Sock Right Sock Left Sock Left Sock Left Sock Right Sock Right Sock Right Shoe Right Shoe Left Shoe Left Sock Right Shoe Left Sock Left Shoe Right Shoe Left Shoe Right Sock Right Shoe on Finish Finish Finish Left Shoe Finish Right Shoe Left Shoe Finish Finish Right Shoe Finish
View full slide show




An Ontology level is needed XML Ontology 256 imports Ontologies add • Structure • Constraints • mappings imports XML Ontology 1 XML Ontology 42 = <> We need a way to define ontologies in XML So we can relate them So machines can understand (to some degree) their meaning
View full slide show




The LRC visits & number of hours visited are up versus year ago. SJC…number of visits increased by 31% and number of hours visited increased by 89% (3) ….had over 1,400 visits per week(3) (2) the LRC … over a 1/3 (36%) of all students visited(2) MVC…number of visits increased by 2% and number of hours visited increased by 6% (3) … had over 1,900 visits per week(3) (2) the LRC … over 4 out of 10 students visited(2) SJC LRC # Visits FA06 SP07 FA07 SP08 FA08 FA06 SP07 FA07 SP08 FA08 16,98 7 14,83 3 18,46 9 18,016 24,121 29,349 31,281 32,530 35,214 33,143 9% 21% 31% 11% 13% 2% 20,97 9 27,515 39,633 46,817 51,660 49,855 22% 47% 89% -11% - 8% 6% Chg. vs. Yr. ago # Hours visited 17,20 2 18,77 4 Chg. vs. Yr. ago Avg. length of visit MVC 52,419 56,104 1hr 1m 1h 16m 1h 8m 1h 32m 1h 39m 1h 47m 1h 48m 1h 26m 1h 28m 1hr 30m # Students that visited(1) 1,933 1,859 2,171 2,099 2,562 3,354 3,625 3,946 4,269 4,299 % Student that visited 37% 32% 31% 33% 36% 41% 41% 43% 43% 40% 8.5 8.0 8.5 8.6 9.4 8.7 8.6 8.2 8.2 7.7 8.6 10.1 9.7 13.1 15.5 15.6 15.5 11.9 12.1 11.6 194 258 379 354 1,065 1,419 2,105 1,950 (2) # Visits / student (1) # Hrs. visited / student (1) # Visits / day(3) # Visits / wk(3) (1)#Unduplicated, on 1 Student (2) onBased Census st (1) Census, (3)Calculation based on 17.5 wk semester, 92 total days7,126 opened, Saturday was counted as ½ day, 9,259 16.7 total 5.5 9,818 day wks. 5,439 5,861 7,087 6,345 8,132 8,841 10,707 Source: MSJCD MIS DataTel XKN, R&P Dept. XCJH.3.3.9
View full slide show




MEMOS MERCHANDISE & SERVICES RECEIVED BY ITCC THROUGH JUNE 30 Entry on FAAINVE Encumbrance exists in FY 2013-14 Calendar date June 1 - June 30 Pay against encumbrance with June transaction date Calendar date July 1 – July 8 Pay against encumbrance with June transaction date Merchandise & services 30 Encumbrance exists in FY 2014-15 No Encumbrance Reduce encumbrance with Pay as a direct pay July transaction date; then with June received by ITCC through June pay as direct pay with transaction date June transaction date Reduce encumbrance with July transaction date; then pay as direct pay with June transaction date Pay as a direct pay with June transaction date Rolled encumbrance or new encumbrance created in FY 2014-15 No Encumbrance Reduce encumbrance with July transaction date; then pay as direct pay with June 30 transaction date Pay as a direct pay with June 30 transaction date Pay against encumbrance with July transaction date/ Reverse FT1 JV with July transaction date. Pay as a direct pay with July transaction 26 date/Reverse FT1 JV with July transaction date. July 11: Encumbrance roll to FY 2014-15 Entry on FAAINVE Encumbrance no longer exists in FY 2013-14 (Central Office only) Calendar date July 14 & later (Regions) Calendar date July 14 & later If material amount, create FT1 JV with June 30 transaction date to accrue expense & liability
View full slide show




Date object constructor for date 7/24/1949 Date object constructor for date 3/12/1988 Employee object constructor: Bob Jones Jones, Bob Hired: 3/12/1988 Birth date: 7/24/1949 Test Date constructor with invalid values: Month 14 invalid. Set to month 1. Day 35 invalid. Set to day 1. Date object constructor for date 1/1/1994 Date object destructor for date 1/1/1994 Employee object destructor: Jones, Bob Date object destructor for date 3/12/1988 Date object destructor for date 7/24/1949 Date object destructor for date 3/12/1988 Date object destructor for date 7/24/1949 Outline Note two additional Datefig07_10.cpp objects constructed; no output output (1 of 1) since default copy constructor used. Destructor for host object Destructor Employee’s manager runsfor before member object hireDate. Destructor for Employee‘s destructors for member Destructor for Date member object birthDate. objects hireDate and object Destructor for Date object hire. birthDate. birth.  2003 Prentice Hall, Inc. All rights reserved. 31
View full slide show




1. Insert students’ names in alphabetical order Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name Name
View full slide show